Commercial parking lot at golden hour with three EV chargers mounted on a freshly painted concrete island, property manager in hard hat shaking hands with technician
Licensed Commercial EV Installation

Bolt It In.Print Revenue.

Level 2 and DC fast chargers installed in your parking lot by licensed electricians. From permit to first kilowatt — in 6 weeks or less.

Scroll to see transformations
Retail & Office · Transformation 01
Bare oil-stained retail parking lot before EV charger installation
Before
Same retail parking lot after Volt EV charger installation with fresh striping and illuminated signage
After

The stall that
sat empty
now earns.

Westgate Commons, a 220-stall suburban retail center in Naperville, IL, added 8 Level 2 stations in November 2024. By February 2025 those stalls averaged 4.1 hours of dwell time per day — the highest of any zone in the lot.

8
chargers
installed in 4 weeks
$22,800
rebate
ComEd incentive received
4.1 hrs
dwell
avg per charging session
94%
uptime
first 90 days of operation

Hard Math

The soil turned.
The harvest is real.

4.2M kWh
Delivered last 12 months
Across 38 active commercial sites
$18,400
Average utility rebate
Volt handles the paperwork, you cash the check
6 weeks
Permit to first charge
From site walk to ribbon-cut
98.7%
Network uptime
24/7 remote monitoring, same-day dispatch
"We expected a year to break even. Volt had us cash-flow positive on the install in 7 months — the rebate covered 40% of the hardware."
DK
Derek Kowalski
Director of Properties · Meridian Commercial Group, Chicago
Fleet Depot · Transformation 02 · 40 Stalls

40 diesel trucks.
40 charging stalls.
One contractor.

Cascade Logistics in Tacoma, WA needed their entire last-mile fleet electrified before the 2025 state clean-fleet mandate. Volt engineered the load distribution, pulled 12 permits across two utility jurisdictions, and delivered 40 DC fast chargers in 11 weeks.

Load management software pre-installed on every unit
NEVI-compliant hardware, federal rebate pre-qualified
Utility coordination handled start to finish
Single point of contact from survey to commissioning
$340K
Federal rebate secured
11 wks
Full depot electrified
62%
Fuel cost reduction
Large fleet depot parking area before EV charger installation, rows of diesel trucks
Before
Same fleet depot after Volt installation with 40 DC fast chargers, fresh line markings and illuminated EV charging bays
After

In Their Words

Property managers.
Fleet operators.
Real results.

"

Volt handled everything — the utility application, the permit, the load study. I signed one contract and three weeks later my tenants were charging. The rebate check came 60 days after commissioning.

SO
Sandra Okonkwo
VP Property Management · Harborview Retail Partners, Seattle
$31,200
Utility rebate received

Free · No Obligation

Get Your
Site Assessment

A licensed Volt electrician will walk your property, assess your panel capacity, identify the highest-ROI stall locations, and deliver a written scope with rebate estimates — at no cost.

⚡On-site electrical assessment included
📋Written scope + rebate estimate delivered in 5 days
💰We identify every available utility incentive
🔒No obligation, no sales pressure
Volt is certified by
NECA MemberIBEW LocalUL Listed HardwareNEVI Compliant
Your Contact Info

No spam. No obligation. We hate cold calls too.

Free Download

The 2025 Commercial EV Rebate Guide

State-by-state breakdown of every utility incentive, federal tax credit, and NEVI grant available to commercial property owners in 2025. Updated quarterly.

50-state utility rebate database
Federal 30C tax credit calculator
NEVI program eligibility checklist
Average rebate by property type
47 pages · PDF · Last updated Feb 2026

Not ready to talk yet?

Download the guide. Do the math. We'll be here when you're ready.

No spam. Unsubscribe anytime.